- Family
- Staff
- Schools
- Programs
- District Info
School districts must ensure heating, ventilation and air conditioning (HVAC) systems are designed, operated and maintained to Occupational Health and Safety and WorkSafeBC standards.
In an effort to strengthen COVID-19 safety measures and improve indoor air quality and reduce the risk of virus transmission, the district has made the following changes to the ventilation systems within the district:
Ventilation is only one layer of protocols and practices in place to keep our schools as safe as possible. Please contact the Maintenance Department at 250-782-2417 for information regarding the ventilation reports.
Below are reports of the systems at each school and other school district facilities.
Title | Last Updated | Download |
---|---|---|
ATEC (CSS) Ventilation System Report | September 12, 2023 | ventilation-system-Atec_0.pdf |
Board Office / Maintenance Ventilation System Report | September 11, 2023 | ventilation-system-Board Office_0.pdf |
Canalta Elementary School Ventilation System Report | September 11, 2023 | ventilation-system-Canalta_1.pdf |
Chetwynd Secondary School Ventilation System Report | September 11, 2023 | ventilation-system-Chetwynd Secondary School_0.pdf |
Crescent Park Annex Ventilation System Report | September 11, 2023 | ventilation-system-Crescent Park Annex_1.pdf |
Crescent Park Elementary School Ventilation System Report | September 11, 2023 | ventilation-system-Crescent Park_1.pdf |
DCSS-Central Campus Ventilation System Report | September 11, 2023 | ventilation-system-Central_0.pdf |
DCSS-South Peace Campus Ventilation System Report | September 11, 2023 | ventilation-system-SPSS_0.pdf |
Devereaux Elementary School Ventilation System Report | September 11, 2023 | ventilation-system-Devereaux_1.pdf |
District Resource Centre Ventilation System Report | September 11, 2023 | ventilation-system-District resource Center_0.pdf |
Don Titus Elementary Ventilation System Report | September 11, 2023 | ventilation-system-Don Titus_1.pdf |
Early Learning Hub Ventilation System Report | September 11, 2023 | ventilation-system-Early Learning Hub_1.pdf |
Ecole Frank Ross Elementary Ventilation System Report | September 11, 2023 | ventilation-system-Ecole Frank Ross_1.pdf |
Little Prairie Elementary Ventilation System Report | September 11, 2023 | ventilation-system-Little Prairie Elem_0.pdf |
McLeod Elementary School Ventilation System Report | September 11, 2023 | ventilation-system-Mcleod Elem_0.pdf |
Moberly Lake Elementary Ventilation System Report | September 11, 2023 | ventilation-system-Moberly Lake_1.pdf |
Parkland Elementary School Ventilation System Report | September 11, 2023 | ventilation-system-Parkland Elem_0.pdf |
Pouce Coupe Elementary Ventilation System Report | September 11, 2023 | ventilation-system-Pouce Coupe_2.pdf |
Tremblay Elementary School Ventilation System Report | September 11, 2023 | ventilation-system-Tremblay_1.pdf |
Tumbler Ridge Elementary School Ventilation System Report | September 11, 2023 | ventilation-system-TRE Elem.pdf |
Tumbler Ridge Secondary School Ventilation System Report | September 11, 2023 | ventilation-system-TRSS_0.pdf |
Windrem Elementary School Ventilation System Report | September 11, 2023 | ventilation-system-Windrem_1.pdf |
Erase is all about building safe and caring school communities. This includes empowering students, parents, educators and the community partners who support them to get help with challenges, report concerns to schools, and learn about complex issues facing students.
Posted | Route | Status |
---|---|---|
9 hours ago | Dawson Creek #16: Tomslake (Secondary) | Cancelled |